APC – Galaxy VS – 75000 – 75 kVA – Three Phase Online UPS

Manufacturer

OEM Part Number

APC-GVSUPS75KFS

GPS Part Number

67-APC-GVSUPS75KFS

Price:

Specifications
Voltage WPC AH/kVA Length Width Height Weight
208VAC N/A 75 Kva 34" 21" 59" 706 lb
Voltage 208VAC
WPC N/A
Amp/H 75 Kva
Length 34"
Width 21"
Height 59"
Weight 706 lb
Galaxy VS UPS — 75 kW / 75 kVA, 208 V 3-Phase (External Battery System Required)

Highly efficient, easy-to-deploy 75 kW, 208 V three-phase UPS delivering best-in-class power protection and low total cost of ownership for edge, small and medium data centers, and commercial & industrial critical infrastructure. Designed for external battery cabinets, allowing full runtime customization based on site requirements. Includes 5×8 start-up service for professional commissioning.

Why these fail
  • Improper battery sizing — external banks are mismatched to discharge current or runtime goals.
  • High harmonic loads — excessive distortion stresses rectifier components and increases heat.
  • Underestimated fault levels — installations exceed equipment short-circuit withstand capability.
  • Commissioning shortcuts — sync, bypass, and overload parameters not validated under real load.
Our solution
  • High efficiency operation — optimized from 177…239 V (208 V nominal range).
  • Low input distortion — < 3% THD at full load for cleaner upstream power.
  • Built-in static bypass — seamless transfer during overload or internal fault events.
  • Flexible runtime design — supports external VRLA or lithium battery cabinets (site-configured).
  • 5×8 start-up included — factory-authorized commissioning and configuration validation.
Category Detail
Rated Output 75 kW / 75 kVA
Input Voltage 200 / 208 / 220 V AC, 3-phase
Output Voltage 200 / 208 / 220 V AC, 3-phase
Input Current (Max/Phase) 269 A
Short-Circuit Withstand (Icw) 65 kA
Input THD Less than 3% at full load
Load Power Factor 0.7 leading to 0.7 lagging without derating
Frequency Input 40–70 Hz • Output 50/60 Hz (sync to mains)
Bypass Built-in static bypass
Overload Capability 10 min @ 125% • 60 sec @ 150%
Voltage Regulation ±1% after 50 ms
Crest Factor 2.5
Battery Configuration External battery cabinets required (VRLA or lithium, site configured)
Service & coverage

5×8 start-up service ensures proper commissioning, parameter setup, and operational validation. External battery runtime is determined by cabinet configuration and site load profile.

💡
Design tip: Confirm DC bus voltage compatibility and maximum discharge current when selecting external battery cabinets for 75 kW load support.
🛠️
Tech support: Need help sizing external battery cabinets or confirming 200/208/220 V site compatibility? Email gps@gruber.com.