Manufacturer
OEM Part Number
GPS Part Number
Categories
Tags
Call for Price
| Voltage | AH/kVA | Length | Width | Height | Weight |
|---|---|---|---|---|---|
| 208VAC | 150 Kva | 34" | 21" | 59" | 640ย lb |
| Voltage | 208VAC |
| Amp/H | 150 Kva |
| Length | 34" |
| Width | 21" |
| Height | 59" |
| Weight | 640ย lb |
Highly efficient, easyโtoโdeploy 150 kW, 480 V 3โphase UPS engineered for edge, small/medium data centers, and critical commercial/industrial infrastructure. Designed for external battery systems and includes StartโUp 5×8 service.
Bestโinโclass power protection with low total cost of ownership โ high efficiency, low input distortion, robust shortโcircuit withstand, and tight output regulation for sensitive IT and industrial loads.
| Category | Detail |
|---|---|
| Main Input Voltage | 480 V AC, 3โphase |
| Max Input Current / Phase | 223 A |
| Input Frequency | 40 โ 70 Hz |
| Input THD (Full Load) | < 3% |
| Load Power Factor | 0.7 leading to 0.7 lagging (no derating) |
| Efficiency (Full Load) | Highโefficiency operation (spec range: 408โฆ552 V @ 480 V) |
| Output Voltage | 480 V AC, 3โphase |
| Rated Power | 150 kW / 150 kVA |
| Max Configurable Power | 150 kW / 150 kVA |
| Bypass Type | Builtโin Static Bypass |
| Crest Factor | 2.5 |
| Output Voltage THD | < 1% (linear load) and < 5% (nonโlinear load) |
| Output Voltage Tolerance | ยฑ1% after 50 ms |
| Overload Operation | 10 minutes @ 125% and 60 seconds @ 150% |
| Short Circuit Withstand (Icw) | 65 kA |
Includes StartโUp 5×8: Deployment/startup service package (5×8 coverage) to help ensure correct commissioning and a clean handoff into production.
External batteries required: Battery cabinets/strings are selected to match your runtime, site constraints, and code requirements.
| Model / Variant | Voltage | Battery Type | Notes |
|---|---|---|---|
| Galaxy VS 150 kW | 480 V 3โphase | External batteries | Includes StartโUp 5×8; builtโin static bypass; configurable runtime via external battery system. |
Note: Final configuration (battery cabinet selection, breaker coordination, wiring, and commissioning scope) depends on site requirements and local code. Provide your runtime target and oneโline, and weโll help align the correct external battery solution.