Products

Call Now For Support
1-800-658-5883

ABB – CAL5-11 – Auxiliary Contact Block – Tested

Manufacturer

OEM Part Number

CAL5-11

GPS Part Number

20-ABB-CAL5-11

Price:

$38.00

Specifications
View Spec Sheet
Voltage AH/kVA Length Width Height Weight
24 – 250 V 10 A 3" 1" 3" 1 lbs
Voltage 24 – 250 V
Amp/H 10 A
Length 3"
Width 1"
Height 3"
Weight 1 lbs
Auxiliary Contact Block โ€” ABB CAL5-11
Side-mount โ€ข 2-Pole (1ย NOย +ย 1ย NC) โ€ข Fits A9โ€ฆA75 & N contactor relays

Genuine ABB side-mounted auxiliary contact block professionally removed from a functioning system, then cleaned, inspected, and shop-tested. Drops onto the left or right side of compatible ABB A/AE/AL/N frames.

Where itโ€™s used (typical)
  • Extra signaling / interlocking contacts on ABB A9โ€ฆA75 contactors and N contactor relays
  • Control circuits, status indication, permissives, and ladder logic expansion
  • Left- or right-side clip-on mounting with function marking
At-a-Glance Specs
Parameter Detail
Manufacturer ABB
Part number CAL5-11 (2-pole side-mount; 1ย NOย +ย 1ย NC instantaneous)
Utilization category AC-15 / DC-13 (auxiliary control duty)
Rated operational current (Ie) AC-15: 6ย A โ‰ค240ย V, 3ย A @ 400ย V. DC-13: 6ย A @ 24ย V โ†’ 0.30ย A @ 220โ€“250ย V.
Rated operational power (Pe) N/A โ€” auxiliary contacts (no motor power switching)
Rated operational voltage (Ue) Aux circuit up to 690ย Vย AC; Rated insulation Ui 690ย V (IEC), UL/CSA 600ย V
Control circuit (coil) N/A โ€” passive contact block (no coil)
Poles & auxiliaries 2 contacts total: 1ย NO + 1ย NC (instantaneous)
Terminations Screw terminals; auxiliary terminals IP20
Mounting Clip-on left or right side of A9โ€ฆA75 (A/AE/AL), N & related relays
Dimensions (H ร— W ร— D) 74ย mm ร— 12ย mm ร— 62ย mm (2.91ย in ร— 0.47ย in ร— 2.44ย in)
Weight 0.05ย kg (~0.11ย lb)
Compliance IECย 60947-5-1; UL/CSA as marked
Condition Tested pull โ€” cleaned, inspected, verified; light cosmetic wear only
What โ€œTested Reclaimed Partโ€ Means
  • Visual inspection for heat discoloration, terminal condition, cracks, label integrity
  • Mechanical open/close and latch integrity check
  • Electrical verification: insulation resistance and functional contact test per shop procedure
Condition, Options & Warranty
Option Whatโ€™s included Warranty
Tested Pull Cleaned, inspected, verified operation; intact labels; ready to install 90โ€‘Day
Gruber Power Services